Live 5-Day Challenge | Craft Your Natural Skincare Brand Starts 23 Feb • Now just $17 (was $57)

Days
Hours
Minutes
Seconds
Search

Virar-alibaug Multimodal Corridor Route Map -

The 126-km project is divided into two main phases to streamline construction: Phase 1 (Navghar to Balavali):

Near Virar (NH-48/Mumbai-Ahmedabad Highway).

So the route map is – road (red) + rail (blue dashed). virar-alibaug multimodal corridor route map

By acting as an outer ring road around Mumbai, the corridor will decongest the island city by diverting long-distance and cargo traffic directly to JNPT, the Navi Mumbai airport, and national highways, bypassing internal city bottlenecks.

The is a proposed high-capacity access-controlled expressway in Maharashtra, India. It is designed to decongest the Mumbai–Pune Expressway and the old Mumbai–Goa Highway (NH-66) by connecting the western and eastern coasts of the Mumbai Metropolitan Region (MMR). The 126-km project is divided into two main

: It provides direct access to the Jawaharlal Nehru Port Trust (JNPT) and the upcoming Navi Mumbai International Airport. Project Specifications

This southern leg transitions the heavy multi-modal traffic from the highway junctions down through Pen and into the coastal and tourist hub of Alibaug, finalizing the 126 km loop. Strategic Multi-Modal Connectivity the Jawaharlal Nehru Port Trust (JNPT)

As of mid-2026, the VAMMC has transitioned from the planning stage to active execution.

| Location | Key Feature / Junction | |---------------------------|---------------------------------------------------| | | Start point; link to NH-48 & Western Rly | | Bhiwandi | Interchange for NH-160 (Ahmednagar road) | | Kalyan (eastern bypass)| Link to Kalyan–Badlapur road & Central Rly | | Navi Mumbai | Connection to Atal Setu (MTHL) via future spur | | Panvel | Major hub – links to Sion–Panvel Expressway & NH-66 | | Khopoli | Spur connection to Mumbai–Pune Expressway | | Pen | New greenfield segment; Pen–Khopoli link road | | Nagothane | Interchange for Roha–Nagothane industrial belt | | Alibaug (Rewas) | End point; close to proposed JNPT–Rewas connector|

The map specifically aligns with key projects like the Navi Mumbai International Airport (NMIA) , the Jawaharlal Nehru Port Trust (JNPT) , and the Mumbai Trans Harbour Link (MTHL) . Phased Construction

Nearly 80-90% of the land for Phase 1 has been successfully acquired.